Pro-Formula Concrete Countertop Project Calculator

Create a materials list for your concrete countertop project by completing the steps below.

NOTE: Color variations may occur due to local and regional variables which impact the color of your sacked concrete. We suggest making a sample before proceeding with your project.


The type of Surface Finish you select determines the Finishing Tools provided in your Kit.

GROUND surface (exposed aggregate)
with MATTE finish
GROUND surface (exposed aggregate)
with POLISHED finish
UN-GROUND surface (no exposed aggregate)
with POLISHED finish
Please do not include Finishing Tools in my Project Materials.


Please do not include Decorative Aggregates in my Project Materials.


Enter your countertop dimensions below:
(for example, Surface Area: 50.75 Sq.Ft. and Thickness: 2.5 Inches)

Surface Area:

Sq. Ft.

AND

Thickness:

Inches
OR Total Area:

Cu. Ft.



Project Materials
Qty.
Ext. Price
 
 
 
 
 
 
 
 
 
Materials List Total
$ 0.00



PROJECT REMINDER:
You will need to add the following (available at your local hardware store) to your CHENG Pro-Formula Mix and NeoMix Original Products to yield a concrete countertop:

6 bags of 60-pound sacked concrete (5000 psi) OR 4.5 bags of 80-pound sacked concrete (5000 psi) for every 3 cu. ft. of countertop. DO NOT USE any air-entrained bagged mixes.

Review the CHENG Pro-Formula Countertop Process.
HACKER SAFE certified sites prevent over 99.9% of hacker crime.